Fix the data where it is created
Check what your data actually looks like, then fix the causes where records are created rather than cleaning up exports forever.
- How long
- 6 to 12 weeks, overlapping the next phase
- Who owns it
- Your analyst, with the supervisors of the units entering data
What you get
Numbers you can defend, and a clear list of which measures are trustworthy today and which need work first.
Do this first
Pick the one field your most important measure depends on and count how often it is blank. That number usually ends the debate about whether this phase is needed.
Start here: do not clean up history first. Pick a date, measure forward from it, fix how records are created now, and go back only for history a specific decision actually needs. This one choice separates agencies that publish in six months from agencies still cleaning in year two.
The second thing to know is that data quality is an operations problem, not a technical one. A field that is blank 40% of the time is blank because the system never required it, the workflow asks for it at the wrong moment, or nobody told staff it mattered. None of those get fixed in a spreadsheet.
Why agencies get stuck here
Agencies decide to clean up ten years of history before publishing anything, spend all their goodwill on work nobody can see, and never get to a first number.
What to do
- 1
Check what you actually have
Run the basic checks on the fields your measures depend on: how often each is blank, values that should not exist, dates in impossible order such as a case closed before it was filed, hearings in the past with no outcome recorded, duplicate people, and how often race, ethnicity, and language are unknown.
- 2
Pull fifty files and check them by hand
Compare fifty to a hundred random records against the underlying file. Nothing else tells you whether the data is actually correct. This is the check that finds a unit recording something correctly by its own convention and incorrectly by yours. Half a day, once a quarter.
- 3
Fix causes in this order
Each step is cheaper and lasts longer than the one after it.
- Change the system first: make required fields actually required, replace free typing with a list to pick from, and remove dead codes.
- Change the process second: ask for the information while the person is standing there, not later from memory.
- Train third, and be specific. Show a unit its own numbers. General data quality training changes nothing.
- Patch it in software last, and write down which system problem each patch covers for, so it can be removed later.
- 4
Collect contact details where the person first appears
This is the highest-value fix available to most agencies, and it is usually on someone else’s form. You can never reach more people than you have contact details for, so this caps every attendance measure you will ever report. For a traffic or municipal court the first contact is the roadside, and the form is the citation, owned by the police agency rather than the court.
- Work with your issuing agencies to add a mobile number, an email, and a language preference to the citation.
- Check the details are not just written down but typed in and passed through to your system.
- Track how often details are captured, by agency, and tell each agency their own number every month.
- 5
Say what "good enough to publish" means
Decide the point below which a measure is not published, or is published with a visible warning. A clearance rate is fine with 2% unknown case types and misleading with 40%. Setting this in advance is what lets you publish early without publishing something you cannot defend.
Decide these before you move on
- What date do you start measuring forward from, and what history is genuinely worth going back for?
- How good does a measure have to be before you publish it?
- Which forms will you change, and which partner agency owns each one?
What you will have
- A summary of what your data actually looks like
- A short list of quality checks with owners and targets
- A plan for fixes at the source
- Contact capture rates by agency
You are done when
- Every field your measures depend on has been checked.
- Every failing check has a person’s name against it and a date.
- At least one change has been made in a source system.
- You have announced the date you measure forward from.
- You know your contact capture rate and who owns each form.
What goes wrong
Cleaning history before publishing anything
The most expensive mistake in this guide. It spends all your leadership goodwill on invisible work, and the cleaned-up history is usually less useful than the last six months would have been.
Patching in software what should be fixed at the source
Every patch is debt that grows, and it hides the real problem from the people who could actually solve it.
Overwriting the original values
Once the original is gone, nothing built on it can be checked or rebuilt. Always translate, never overwrite.
Treating a high unknown rate as an inconvenience
Race unknown 40% of the time, in a court being asked about disparities, is not an obstacle to work around. It is the finding.
Blaming staff for a field the system never required
It ends cooperation immediately. Check the system before the people, every time.